A 4.7-mile freight train of 696 empty ore cars ran 535 miles over two days with electric and diesel locomotives spread through it and synced by radio so they pulled and braked as one, and it topped a
Key Points:
- On October 18, Transnet Freight Rail in South Africa completed a 4.7-mile-long freight train with 696 empty ore cars, setting a new world record for train length, pending Guinness World Records confirmation.
- The train traveled approximately 535 miles over two days from the Sishen mine to the port of Saldanha Bay, using a Radio Distributed Power system that spreads locomotives throughout the train and synchronizes them via radio to manage the immense pulling and braking forces.
- This distributed power approach reduces stress on the train cars and tracks by sharing longitudinal forces more evenly, allowing safer handling of such an extraordinarily long train.
- The run was part of a train evaluation program focused on technical knowledge and performance rather than commercial operation, with all cars running empty to safely study train dynamics over the route.
- The previous record was held by BHP in Australia with a 4.57-mile loaded ore train; Transnet’s train is longer by about 700-800 feet but lighter since it was empty, while BHP’s train remains the heaviest freight train on record.