Boeing's Win Lasted Exactly Two Days
Key Points:
- The FAA certified the Boeing 737 MAX 7 on August 3 after nearly a decade-long review involving major system redesigns, fulfilling a key goal for Boeing and operators like Southwest Airlines, which plans to use the MAX 7 to replace its aging 737-700 fleet.
- Just two days later, the FAA issued an airworthiness directive ordering structural inspections on 1,429 737 MAX 8, 9, and 8200 aircraft worldwide due to potential cracks in a metal reinforcement called the bear strap, which redistributes stress around the forward galley door cutout.
- No cracks have been found on any 737 MAX in service to date; the directive was extended from older 737 NG models because of shared design features, with the FAA acting preemptively to prevent similar issues.
- The cracks stem from production-quality failures—surface scratches caused during manufacturing when sealant and adhesive were removed—highlighting ongoing quality control challenges for Boeing following previous assembly issues.
- Southwest and other operators face additional operational hurdles as inspections proceed, but no aircraft have been grounded; the situation underscores continued scrutiny by regulators and the importance of factory quality in Boeing’s recovery efforts.